FLEURHOF
SUBSTATION
Calgro M3
Roodepoort area between Main Reef Road and Soweto
City of Johannesburg (City Power)
9527 affordable houses with a Phase 1 Firm Capacity of 90MVA (3-Bay) and Future (4-Bay) Firm Capacity of 135MVA to allow for ongoing Development in the Area. Design & Construct a new 88/11kV 4-Bay Prefabricated GIS Substation with 3 x 45MVA 88/11kV Transformers (Phase 1) in the Fleurhof Development Area, with allowance being made for future 4th Bay. Design & Construct two upgraded Overhead Line Bays in the Existing Sentraal Substation to incorporate the combined load (225MVA) of the existing Roberville Substation (90MVA) and new Fleurhof Substation (135MVA). Design & Construct a new Dual Overhead Line (Twin Lisbon Conductor) to replace the Existing Line from Sentraal Substation to Robertville Substation T-Off and from there a Dual Overhead line (Single Lisbon Conductor) to Fleurhof Substation suitable for the predicted loadings. Hand Over Substation, Upgrades and Overhead Lines to City Power after Commissioning.