Projects
RIVERSIDE VIEW
SUBSTATION
Valumax
Diepsloot
Eskom
9605 new low cost houses with Total Demand of 44 MVA. Construct new 2 x 20MVA 88/11kV Substation including “Loop in Loop out” from Existing Overhead Line and Upgrade Existing Eskom Klevebank-Laezonia 88kV Overhead Lines to 2x Panther Conductor (1.3km) from new Substation to Klevebank Substation. Install new Overhead Line Bay at Existing Klevebank Substation. Upgrade the Protection Schemes at Klevebank and Laezonia Substations to match that of new substation. Install about 1.3km figbre optic on Existing Overhead Line from new Substation to Klevebank Substation. Substation Handed Over to Eskom after Eskom Approved and Commissioned it.